Weather
  •  
    Rīgā, -6 °C, S wind 4 m/s
    jan
    23
  •  
    Rīgā, 1 °C, S wind 7 m/s
    jan
    24

Projects

2014

 

Reconstruction of the state highway A6 in the section between Energetiku and Riga street in Salaspils city.

 

Reconstruction of the state highway A6 in the section between Energetiku and Riga street in Salaspils city.

Description: new traffic lights set installed and new asphalt concrete layers paved.

 

Reconstruction of the regional road P107 Skrunda - Ezere in the section from km 19,34 to ko 20,34

Description: reconstruction of base layers and pavement, fixing of gradients by installing of geosintetic materials.

 

Reconstruction of Melioracijas street in Ozolnieki city.

Description: reconstruction of storm water drainage, building of base layers and asphalt concrete pavement.

 

Reconstruction of the state highway of A9 Riga - Liepaja in the section around km 38,7 including bridge over train ways.

Description: construction of new road for temporary needs with new trainway crossing and alarm system, maintenance of the temporary road, dismantling of the temporary road after finishing of the object, building of base layers and asphalt concrete pavement.

 

Reconstruction of streets in the Preili city and Aizkalne, Peleci, Preili parish.

Description: construction of concrete brick pedestrian sidewalks, building of base layers and asphalt concrete pavement of streets.

 

Reconstruction of Perses street in the Marupe city in the section from Daugavas street to Pededzes street.

Description: construction of storm water drainage system and building of concrete brick pavement layer.

MoreHide

2013

 

Reconstruction of the state highway of Class I P4 Riga - Ergli (intersection to Mazozoli - Ergli), km 90,7 - 99,66.

 

Reconstruction of the state highway of Class I P4 Riga - Ergli (intersection to Mazozoli - Ergli), km 90,7 - 99,66.

Execution period: 07.2013 - 12.2013

 

Reconstruction of Lacplesa street in the section from Riga street to Raina street in city of Valmiera.

Description: full reconstruction of road base levels and pavement, reconstruction of Dzirnavu lake underroad drainage, reconstruction of storm water drainage, reconstruction of street lighting, communication networks and electricity supply networks.  

Execution period: 06.2013 - 11.2013

 

Reconstruction of transit streets Jelgavas, Brivibas, Rigas and Jekabpils through city of Jaunjelgava territory.

Execution period: 04.2012 - 10.2013

 

Reconstruction of the state highway of Class I P74 from Silini to Akniste in the section from km 0,00 to 13,4 including bridge over the Podvaze river.

Execution period: 05.2012 - 06.2013

 

Surface dressing of Cesu street in the section from railway embankment to Kauguru street and the sections of Cempu street from Brengulu street to railway crossing in Smiltene direction and to entrance to AGA in Brenguli direction.

Execution periods: 05.2013 - 06.2013

MoreHide