Projects

2008

Reconstruction of road V1 „Valdlauči – Rāmava” in Riga Region

Description: Construction of road structure: laying of crush stone base, laying of asphalt concrete paving, installation of traffic lights, construction of culverts, reconstruction of electricity network, construction of rain water drainage, road furniture.

Execution period: 02/2008 – 09/2008

 

Construction of the section „Gaujas Street – Meža Prospect” for Eastern highway in Riga

Description: The construction of rain water drainage, water-main and melioration ditches has been provided in the object.

Execution period: 05/2007 – 08/2008

2007

Reconstruction of Graudu Street in the section from Vienības Avenue to Valdeķu Street in Riga

Reconstruction of Graudu Street in the section from Vienības Avenue to Valdeķu Street in Riga

Description: During the reconstruction the asphalt concrete carriageways have been constructed, concrete cobblestone sidewalks have been constructed, concrete curbs for roads and sidewalks have been replaced, ground of green zone has been stabilized.

Execution period: 05/2007 – 10/2007

 

Renovation of asphalt concrete carriageway of Juglas Street in the section from Malienas Street to Brīvības Avenue in Riga

Description: During the reconstruction the asphalt concrete carriageways have been constructed, asphalt concrete sidewalks have been constructed, concrete curbs for roads and sidewalks have been replaced, ground of green zone has been stabilized, more than one hundred water drainage wells have been replaced or cleaned.

Execution period: 05/2007 – 10/2007

 

Reconstruction of Access road of Kundziņsala Line 3 in Riga

Description: During the reconstruction the asphalt concrete carriageways have been constructed, asphalt concrete sidewalks have been constructed, concrete curbs for roads and sidewalks have been replaced, ground of green zone has been stabilized, gravel/crushed stone road shoulders have been stabilized.

Execution period: 05/2007 – 10/2007

MoreHide

2006

Reconstruction of road “Rīga – Ērgļi”

Reconstruction of road “Rīga – Ērgļi”

Description: Construction of crushed stone base and laying of asphalt concrete paving.

Execution period: 04/2005 – 09/2006

 

Construction of 1st and 2nd section of Saulkrasti by pass road

Description: Construction of road bed and culverts, base and surfacing.

Execution period: 08/2005 – 12/2006

 

Street reconstruction accordingly to detailed plan (Sporta Street, Vesetas Street, Zirņu Street, railway overpasses) in Riga

Description: 1st stage: Construction off road structure: crushed stone base, laying of asphalt concrete paving, construction of cobblestone paving, construction of culverts, reconstruction of electricity network, construction of rain water drainage, construction of water-main, road furniture, construction of telecommunication networks. 2nd stage: construction of asphalt concrete paving, lighting construction, construction of rain water drainage, road furniture.

Execution period: 1st stage 03/2005 – 08/2006; 2nd stage 02/2006 – 09/2006

 

Pavement reconstruction for Presidential Palace square

Description: Construction of cobblestone paving, construction of rain water drainage and lighting.

Execution period: 07/2006 – 11/2006

 

Pavement reconstruction for Freedom Monument square in Riga

Description: Laying of asphalt concrete paving for Freedom Monument square.

Execution period: 09/03/2006 – 30/04/2006

MoreHide

2005

Reconstruction of A.Deglava Street section form A.Saharova Street to Lubānas Street in Riga

Reconstruction of the intersection of A.Deglava Street and A.Saharova Street

Reconstruction of A.Deglava Street section form A.Saharova Street to Lubānas Street in Riga

Reconstruction of the intersection of A.Deglava Street and A.Saharova Street

 

Description: During the reconstruction the asphalt concrete carriageways have been constructed, asphalt concrete sidewalks and concrete cobblestone sidewalks, as well as concrete curbs for roads and sidewalks have been replaced, ground of green zone has been stabilized, more than one hundred storm water drainage wells have been cleaned or replaced.

Execution period: 06/2004 – 10/2005